Lost Cabin Gas Plant

Lost Cabin Gas Plant - Lost Cabin, Wyo.

      This gas plant included the construction of Train 3 for Burlington Resource's Lost Cabin Gas Plant., a sour gas sweetening facility located in Lost Cabin, Wyoming. The plant consists of three (3) trains. The first was designed and constructed by Raytheon Engineers and Constructors. The second and third were both engineered by Washington Group, formerly Raytheon, and constructed by TIC.

      The second train was a 62MMSCFD facility. The capital cost for Train 2 was $110 million and construction took 14 months with total man-hours of 436,946 and a peak workforce of 250 employees.

      Train 3 is the largest of the three trains at 180MMSCFD, and when combined with Trains 1 and 2, brings the total plant capacity to 313MMSCFD. A total of 1,020,538 man-hours were worked, with a peak workforce of 450 employees. The capital costs of Train 3 were $280 million.

      TIC project

      Quick Links
      Featured Projects
      Haynes No. 3 and No. 4 Generating Station
      Long Beach, Cal.
      TD Ameritrade Headquarters
      Omaha, Neb.
      Contact Kiewit

      Home Office : 3555 Farnam St. Omaha, NE

      Home Office : (402) 342-2052

      General Info : info@kiewit.com

      Locations Page   |   Career Search

      ThinkSafety-color.png  Quality-color.png

      Environmental-color.png  Compliance-color.png

      Contact Kiewit

      Kiewit Australia
      2 Kings Park Road
      West Perth, AU-WA 6005
      Phone: +61 8 6230 6200

      © 2021 Kiewit Corporation. All Rights Reserved.